-
Rochester Schools Modernization ProgramRochester CitySchool DistrictCityof RochesterThe RSMP ...The Rochester Schools Modernization Program is a multi-phase capital initiative of the
Rochester City School District in partnership with the City of Rochester.Charged with overseeing the Program is the Rochester Joint Schools Construction Board. The RJSCB includes seven members: Three are appointed by the Superintendent of Schools; three are appointed by the Mayor of the City of Rochester; and the seventh is appointed by mutual agreement by the Superintendent and Mayor. Click on the file below to view the Cooperative Agreement among the City, the District, and the RJSCB regarding the Program.
Phase 1Planning for Phase I, which was authorized by the State of New York, is expected to total up to $325 million in bonded projects. The RJSCB, on January 31, 2011, voted to send the Draft Comprehensive School Facilities Modernization Plan, Phase I, to Albany for review by the State. The plan is a concept draft for initial review by NYS. Plans for individual buildings will be refined during the final design process with the input of the Building Advisory Committees for each building.The Phase I Comprehensive School Facilities Modernization Plan is over 300 pages with images, charts, and other large format files. The document has been broken up into 5 parts for faster downloading. Please click on the links below to download each of the 5 parts.Phase 2New York State has authorized up to $435 million to renovate Rochester Schools from 2016 to 2021 during Phase 2 of the Facilities Modernization Plan. On April 25, 2016 the RJSCB voted to send the Comprehensive Master Plan for Phase 2 to the State Education Department and to the New York State Comptroller for review and approval. These documents provide a comprehensive overview of the Phase 2 plan.
Volume 1: Strategic Plan Summary
An overview of the District’s facility needs and the 13 schools recommended for renovation during Phase 2, with project descriptions and anticipated costs. Approved by the Rochester Board of Education on March 24, 2016, and the Rochester Joint Schools Construction Board on April 4, 2016.Volume 2: Financial Plan
A detailed analysis of plans for working with State, County and City government to provide cost-effective financing for projects during Phase 2. Approved by the Rochester Joint Schools Construction Board on April 25, 2016, and the Rochester Board of Education on April 28, 2016.Volume 3: Diversity Plan
A description of the steps that will be taken by the RJSCB to ensure that minority-owned, women‐owned, and disadvantaged business enterprises and minority and women members of the workforce are given the opportunity to participate in the performance of the contracts awarded. Approved by the Rochester Joint Schools Construction Board on April 25, 2016.Volume 4: Supplementary Appendix
Facility drawings, condition surveys, enrollment analyses and other detail related to Phase 2.Annual Reports
The Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2011-12 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2012-13 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2013-14 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2014-15 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2015-16 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2016-17 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2017-18 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2018-19 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2019-20 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2020-21 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2021-22 is available by clicking hereThe Rochester Joint Schools Construction Board's Annual Report for the Fiscal Year 2023-24 is available by clicking hereThe Board determined, following several months of review, that the proposed Rochester Schools Modernization Program would not result in significant adverse environmental impacts. The complete Environmental Assessment Form, Parts 1, 2, and 3, upon which this determination was based, are available for download below. The report has been broken into three parts for easier access, as the report totals more than 350 pages. Click the links below to access the document.The Board has amended the original SEQRA report based on the design changes to the first six projects in Phase I. The original Negative Declaration was reaffirmed. See the amended report hereA second update to the original SEQRA report based on the design changes to the next group of projects in Phase I has been completed. The original Negative Declaration was reaffirmed. See the second amended report here.Phase II State Environmental Quality Review Act (SEQRA)The complete Environmental Assessment Form, Part 1, is available for download here.The list of schools included in Phase 2 has been updated. The revised Part 1 Environmental Assessment Forms (EAFs) for each school are available for download here.The Board determined, following several months of review, that the proposed Rochester Schools Modernization Program would not result in significant adverse environmental impacts. The complete Environmental Assessment Form, Parts 1, 2, and 3, upon which this determination was based, are available for download below. The report has been broken into three parts for easier access, as the report totals more than 350 pages. Click the links below to access the document.
Active Requests for Qualifications / Requests for Pricing / Requests for Bids:Design Services for Edison Career & Technology High School
The Rochester (NY) Joint Schools Construction Board (“RJSCB”) is seeking proposals from qualified Architectural/Engineering (“A/E”) firms to provide design services, as part of Phase III of the Rochester Schools Modernization Program (“RSMP”). The selected firm shall have overall design responsibility for planned renovation of the following Phase 3C high school:
Edison Career & Technology High School, 655 Colfax St, Rochester, NY 14606. The estimated construction cost for this project is currently up to $61M.
The Request for Proposals (RFP) can be found and downloaded from the school district’s website at: https://www.rcsdk12.org/rsmp (document link located halfway down webpage). There is no expressed or implied obligation for the RJSCB to reimburse the responding firms for any expenses incurred in preparing proposals in response to this request.
A walkthrough of the building and the site will be conducted by the RJSCB’s Program Manager, and Representatives of the School District on 17 December 2024 at 3:00 pm starting at the Main Entrance of the Edison Career & Technology High School, 655 Colfax St, Rochester, NY 14606.
Proposals shall be addressed to Mr. Pépin Accilien, P.E., Program Director, and will be accepted until Friday, 10 January 2025, by 12:00 Noon, at the RSMP office located at 70 Carlson Road, Suite 200, Rochester, NY 14610. The RJSCB reserves the right to reject any or all proposals submitted.
It is the respondent’s responsibility to ensure that their proposal is received by the RJSCB before the deadline, whether sent by mail or by means of personal delivery. All proposals received after the deadline stated in the RFP will not be considered and will be returned unopened to the firm. The responding firm assumes the risk of any delay in the mail or in the handling of the mail.
Questions during the proposal period must be emailed to: Mr. Pépin Accilien at paccilien@savinengineers.com, by 24 December 2024. Questions received orally or by electronic means will not be accepted or responded to by the RSMP.
Construction Management Services at Edison Career & Technology High School
The Rochester Schools Modernization Program (RSMP) Phase III is soliciting proposals from suitably qualified Firms to provide Construction Management Services for Phase 3C renovation project at Edison Career & Technology High School, 655 Colfax St, Rochester, NY 14606
Proposals shall be submitted in response to a Request for Proposals (RFP) which can be found at the following website: https://www.rcsdk12.org/rsmp
Proposals submission deadline is Friday, 10 January 2025, 12:00 Noon, at the RSMP’s office, 70 Carlson Road, Suite 200, Rochester, NY 14610. Proposals are to be addressed to: Mr. Pépin Accilien, P.E., Program Director, at the same address identified above.
Questions during the proposal period must be emailed to Mr. Pépin Accilien by 5:00 PM, 24 December 2024, at paccilien@savinengineers.com . Questions received orally will not be accepted or responded to by the RSMP.
Commissioning Services for Phase III Schools
The Rochester (NY) Joint Schools Construction Board (“RJSCB”) is seeking proposals from suitably qualified firms to provide services for commissioning of systems, as part of Phase III of the Rochester Schools Modernization Program (“RSMP”). The selected firm(s) shall have overall commissioning responsibility for planned renovation of the following six (06) schools projects under the program:
- Dr. Martin Luther King Jr. School #09, 485 N Clinton Ave, Rochester, NY 14605
- Joseph C Wilson High School, 501 Genesee St, Rochester, NY 14611
- Padilla High School at the Franklin Campus, 950 Norton Street, Rochester, NY 14621.
- Edison Career & Technology High School, 655 Colfax St, Rochester, NY 14606
- East High School Campus, 1801 E Main St, Rochester, NY
- Frederick Douglass Campus, 940 Fernwood Park, Rochester, NY 14609
The total estimated construction cost for this program $356M.
The Request for Proposals (RFP) can be found and downloaded from the school district’s website at: https://www.rcsdk12.org/rsmp (document link located halfway down webpage). There is no expressed or implied obligation for the RJSCB to reimburse the responding firms for any expenses incurred in preparing proposals in response to this request.
Proposals shall be addressed to Mr. Pépin Accilien, P.E., Program Director, and will be accepted until Friday, 10 January 2025, by 12:00 Noon, at the RSMP office located at 70 Carlson Road, Suite 200, Rochester, NY 14610. The RJSCB reserves the right to reject any or all proposals submitted.
It is the respondent’s responsibility to ensure that their proposal is received by the RJSCB on or before the deadline, whether sent by mail or by means of personal delivery. All proposals received after the deadline stated in the RFP will not be considered and will be returned unopened to the firm. The responding firm assumes the risk of any delay in the mail or in the handling of the mail.
Questions during the proposal period must be emailed to: Mr. Pépin Accilien at paccilien@savinengineers.com, by 24 December 2024. Questions received orally or by electronic means will not be accepted or responded to by the RSMP.
Phase I Project Labor Agreement (PLA)In the Fall of 2011, the RJSCB hired Seeler Engineering P.C. to perform a PLA Study to evaluate the potential costs/benefits of a PLA for the RSMP. Based on the potential for significant savings outlined in the resulting PLA Study the RJSCB decided to commence negotiations for a PLA with the Rochester Building and Construction Trades Council acting on behalf of the twenty-three craft unions likely to participate in the RSMP Project.Click here to view the final PLA Study.In February 2012, the RJSCB reached an agreement in principle with the Rochester Building and Construction Trades Council for a Project Labor Agreement. This agreement has been approved by the Building and Construction Trades Department of the American Federation of Labor-Congress of Industrial Organizations (AFL-CIO).Click here to view the fully executed PLA.Phase II Project Labor Agreement (PLA)In the Winter of 2016, the RJSCB hired Seeler Engineering P.C. to perform a PLA Study to evaluate the potential costs/benefits of a PLA for Phase 2 of the RSMP. Based on the potential for significant savings outlined in the resulting PLA Study the RJSCB decided to commence negotiations for a PLA with the Rochester Building and Construction Trades Council acting on behalf of the craft unions likely to participate in Phase 2 of the RSMP Project.Click here to view the Phase 2 PLA Study.Meetings of the Board are in person and virtual with the Zoom link below and are open to the public.Upcoming Meetings
__________________________________Members of the Board:
Thomas Richards, ChairJacob Scott, Vice ChairKim Jones
Jesse DudleyRonald GaitherRichard PerrinShawn Farr
Click the links below to see information regarding FOIL Requests